EOS Electrical Job Timeline
Below shows a timeline of some of EOS Electricals major electrical contracts and projects since our inception in 2010.
City of Perth Christmas Decorations (Installation, Maintenance & Removal)
This project involves the installation, maintenance and the removal of new and existing decorations in selected parts of the Perth CBD, Northbridge, East Perth and West Perth. Works are thoroughly and carefully planned and carried out on nightshift to minimise disruption to the public.
Public Transport Centre Emergency Lighting Upgrade
EOS Electrical orchestrated the complete and complex removal, rewire and installation of the emergency and exit lighting system in this fully operational office building. This included a range of Clevertronics zoneworks branded luminaires along with new cabling and supporting infrastructure to complete the fully operational system.
City of Perth Plaistowe Mews Lighting Upgrade
The project consisted of the upgrade of an aging asset while providing the public area and roadway with lighting. This involved the installation of new underground cabling, conduits, and pits, supplying and installing concrete footings for the new light poles and existing switchboard modification.
City of Perth JH Abrahams Reserve Lighting Upgrade
EOS Electrical were contracted to install new pathway bollard lighting in JH Abrahams Reserve in Crawley. This project required trenching in new conduits, pits with concrete collars and engraved labels and the supply and installation of concrete footings along the river side pathway. Throughout the project, the pathway and the park were still being used by the public.
Florence Hummerston Reserve Enhancement Project
As one of EOS Electricals first major projects, we are proud of the installation in Florence Hummerston Reserve. We were engaged by BOS Civil in 2011 who partnered with MG Group to revamp this public open space for the City of Perth. Our scope of works included the supply and installation of
iGuzzini bollard lights, step lights and post top lights and poles. A completely new pit and pipe system was installed by EOS Electrical in line with the design drawings. A new site main switchboard was supplied and installed by EOS Electrical as part of this project. All the required Western Power notices were completed by EOS Electrical as well as comprehensive operation and maintenance manuals handed over to BOS Civil on successful completion of the project.